IN202300100401 |
IIST |
Nd:YAG laser for PIV application |
23-May-2024 14:00 |
23-May-2024 14:15 |
|
SA202300112201 |
SAC |
S Band and L Band load [ Termination] |
23-May-2024 11:58 |
23-May-2024 12:58 |
|
IN202300084001 |
IIST |
Supply, installation and mounting of closed circuit water tunnel |
16-May-2024 14:00 |
16-May-2024 14:15 |
|
SA202300117401 |
SAC |
Need Based Maintenance Contract for ABM Mask Aligner System |
22-May-2024 11:20 |
22-May-2024 12:20 |
|
SA202400041501 |
SAC |
Development of Real-time high speed sensor characterization test setup for 9.4MP image sensor |
14-May-2024 10:00 |
14-May-2024 10:10 |
|
SA202400042601 |
SAC |
180 degree Hybrid Coupler |
22-May-2024 14:00 |
22-May-2024 14:30 |
|
SA202400051101 |
SAC |
Space grade capacitor |
20-May-2024 12:38 |
20-May-2024 13:38 |
|
SA202400052201 |
SAC |
PERIODIC TESTING OF SAFETY RELIEF VALVES AND LIQUID NITROGEN (LN2) STORAGE VESSELS [AS PER SMPV (Unfired) RULES 1981] |
20-May-2024 11:58 |
20-May-2024 12:58 |
|
SA202300237901 |
SAC |
Commercial Grade RF connectors |
20-May-2024 10:57 |
20-May-2024 11:57 |
|
SA202300218101 |
SAC |
On-site Comprehensive Annual Maintenance Contract (CAMC) Of Copier Machines and Rate contract for supply of consumables |
20-May-2024 14:00 |
20-May-2024 14:30 |
|
SA202400051701 |
SAC |
Development of Drive Electronic Hardware for Interline CCD Imager |
23-May-2024 15:00 |
23-May-2024 15:30 |
|
SA202400011101 |
SAC |
Fabrication and delivery of Generic RADAR Waveform Synthesis ASIC using 65nm/55nm CMOS Process |
22-May-2024 14:00 |
22-May-2024 14:30 |
|
SA202400043901 |
SAC |
HELICOIL THREAD INSERT TAP |
17-May-2024 14:00 |
17-May-2024 14:30 |
|
SA202300248801 |
SAC |
Annual Maintenance Services Contract (Non Comprehensive) for UPS |
17-May-2024 14:00 |
17-May-2024 14:30 |
|
IP202400009101 |
IPRC |
Tube Measurement machine |
17-May-2024 14:32 |
17-May-2024 14:32 |
|
NR202300026201 |
NRSC |
PCB Fabrication & Assembly of Next Gen SPARC boards (Production) |
16-May-2024 14:00 |
16-May-2024 14:30 |
|
TR202300030201 |
ISTRAC |
Bench top all in one Microwave Measuring Receiver up to 40 GHz or Higher |
16-May-2024 14:00 |
16-May-2024 14:30 |
|
SA202400045801 |
SAC |
Development of Motorized Deployable/Retractable Boom Mechanism |
03-May-2024 11:00 |
03-May-2024 11:05 |
|
IP202400033601 |
IPRC |
Outsourcing for Sporadic work contract for cooking, servicing & house-keeping in Canteen & Guest House for a period of two years |
09-May-2024 14:00 |
09-May-2024 14:30 |
|
SA202400056501 |
SAC |
Development of Copper Beryllium (Cu-Be) Boom |
10-May-2024 14:00 |
10-May-2024 14:30 |
|
SA202400049901 |
SAC |
Supply of Cryogenic Grade Fiber Glass Epoxy Rods |
10-May-2024 14:00 |
10-May-2024 15:51 |
|
TR202300015301 |
ISTRAC |
Supplying, laying and termination of Optical Fibre cable, Patch cords and Jelly Filled Copper cable at SCC, MOX & IDSN Campus of ISTRAC |
15-May-2024 14:00 |
15-May-2024 14:30 |
|
SA202400032301 |
SAC |
Private Server Cloud of SAC with Rate Contract |
16-May-2024 12:12 |
16-May-2024 12:50 |
|
MC202300008401 |
MCF |
SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF IP BASED AUDIO-VISUAL SWITCHER AT MCF- BHOPAL |
08-May-2024 16:30 |
09-May-2024 10:00 |
|
VS202300434401 |
VSSC |
Automatic weather station |
10-May-2024 14:00 |
10-May-2024 15:00 |
|
IU202400085201 |
IISU |
SMD / BGA Rework Station |
08-May-2024 14:00 |
08-May-2024 14:30 |
|
VS202400160801 |
VSSC |
Non Comprehensive AMC for Powder Characterization Equipment |
09-May-2024 14:00 |
09-May-2024 14:30 |
|
SA202400050201 |
SAC |
Silver flake powder |
30-April-2024 14:00 |
30-April-2024 14:30 |
|
SA202300093401 |
SAC |
AMC FOR CLEAN ROOM LAMINAR FLOW TABLE |
07-May-2024 12:34 |
07-May-2024 13:34 |
|
LE202400012801 |
LEOS |
LASER SAFETY GOGGLES AND IR SENSOR CARD |
30-April-2024 17:00 |
01-May-2024 10:30 |
|
LE202300039301 |
LEOS |
RFP FOR 3D LIDAR |
23-May-2024 17:00 |
24-May-2024 10:30 |
|
VS202400162001 |
VSSC |
Sieve Shaker |
02-May-2024 14:00 |
02-May-2024 14:10 |
|
IN202300052601 |
IIST |
Realtime Computer for Hardware in the loop Simulation |
30-April-2024 14:10 |
30-April-2024 14:15 |
|
VS202400042601 |
VSSC |
AUTOMATIC DILUTION VISCOSITY MEASURING SYSTEM WITH ACCESSORIES |
21-May-2024 14:00 |
21-May-2024 14:01 |
|
SH202400041301 |
SDSC SHA |
Liquid Sensor |
06-May-2024 16:00 |
06-May-2024 16:00 |
|
IP202400014901 |
IPRC |
Supply, Installation and commissioning of TCT control systems |
21-May-2024 14:00 |
21-May-2024 14:01 |
|
IS202400031101 |
URSC |
EM Grade C-Band Packaged MMIC Power Amplifier |
03-May-2024 09:30 |
03-May-2024 10:00 |
|
IP202400018601 |
IPRC |
Pressure Transmitter |
15-May-2024 14:00 |
15-May-2024 14:01 |
|
IP202400002601 |
IPRC |
Supply Installation and Commisioning of Integrated DAS |
07-May-2024 14:00 |
07-May-2024 14:01 |
|
IP202400000801 |
IPRC |
Supply of Redundant Data Acquisition Hardware for Facility/Test Article Measurement & Data Acquisition |
08-May-2024 14:00 |
08-May-2024 14:01 |
|
VS202400111901 |
VSSC |
Supply of Personal Protective Equipment for Powder handling & DED machine operation |
30-April-2024 14:00 |
30-April-2024 14:05 |
|
SH202400035701 |
SDSC SHA |
MLP bearing plate in-situ machining |
06-May-2024 16:00 |
07-May-2024 14:30 |
|
SH202400005701 |
SDSC SHA |
Supply of Stainless Steel wire braided PTFE inner core convoluted hoses as per the enclosed specifications |
02-May-2024 16:00 |
03-May-2024 14:30 |
|
IU202400055101 |
IISU |
MATERIAL PROCUREMENT, PROCESS PREPARATION, PRE-MACHINING, STRESS RELIEVING, FINISH MACHINING, SURFACE TREATMENT, INSPECTION & SUPPLY OF IRU400A & 900 COMPONENTS |
30-April-2024 14:00 |
30-April-2024 14:30 |
|
IS202400026501 |
URSC |
IMMERSION COOLERS FOR VACUUM COLD TRAPS |
30-April-2024 14:30 |
30-April-2024 15:00 |
|
LB202400003201 |
LPSC |
Supply of 47L. capacity brand new gas cylinders for gaseous Nitrogen, Helium and Argon fitted with modular pallet of each 9 cylinders(3X3) as manifold as per the specification |
21-May-2024 14:00 |
21-May-2024 14:30 |
|
LP202400031501 |
LPSC |
Augmentation of AV facility in AD's and Controller's conference halls |
30-April-2024 14:00 |
30-April-2024 14:30 |
|
VS202400182101 |
VSSC |
Double Banana Plug With Solder Turret Terminals |
15-May-2024 13:33 |
15-May-2024 14:33 |
|
VS202300437301 |
VSSC |
Supply, Installation, Commissioning of 5T & 2T EOT Cranes for ReDAMS facility |
02-May-2024 14:00 |
02-May-2024 14:05 |
|
VS202400020201 |
VSSC |
Dehumidifying dry cabinet for package storage |
30-April-2024 14:00 |
30-April-2024 15:00 |
|
IP202400005501 |
IPRC |
Procurement of S.S. Hexagonal Rods, Sheets and Plates |
29-April-2024 10:00 |
29-April-2024 10:05 |
|
IP202400007601 |
IPRC |
Thermo Vacuum Drying System |
29-April-2024 14:00 |
29-April-2024 14:00 |
|
VS202400072601 |
VSSC |
WAVEGUIDE |
31-May-2024 12:24 |
31-May-2024 16:25 |
|
VS202400129301 |
VSSC |
Web-based real time meteorological lightning tracking, monitoring and alert management system subscription service for a region of 1000000 sq km centered at SDSC SHAR (13.73351o N, 80.23471o E) for a period of one year |
30-April-2024 14:20 |
30-April-2024 15:00 |
|
PR202400003701 |
PRL |
Accessories: Vacuum compatible Nanopositioning stages, cables, feedthrough |
13-May-2024 14:00 |
13-May-2024 14:30 |
|
TR202400001401 |
ISTRAC |
Web streaming units |
30-April-2024 14:00 |
30-April-2024 14:30 |
|
TR202300021301 |
ISTRAC |
Warranty Extension & Upgradation of Network Security Devices at ISTRAC |
30-April-2024 14:00 |
30-April-2024 14:30 |
|
MC202400002101 |
MCF |
RFP for refurbishment of 7.2mtr, 3.8mtr and 2.4mtr terminals at MCF hassan |
01-May-2024 16:30 |
02-May-2024 10:00 |
|
SA202300214801 |
SAC |
PCB wiring, Assembly and Testing of QM / FM Payload Electronics Cards and Packages |
22-May-2024 12:00 |
22-May-2024 12:30 |
|
LP202300008801 |
LPSC |
Ambient and high temperature dynamic modulus measurement system using impulse excitation technique |
30-April-2024 14:00 |
30-April-2024 14:00 |
|
LP202200058301 |
LPSC |
EMI TEST FACILITY ESTABLISHMENT FOR EMI/EMC MEASUREMENT OF HIGH POWER SPT |
30-April-2024 12:00 |
30-April-2024 12:05 |
|
LE202400002901 |
LEOS |
Plasma Enhanced Chemical Vapour Deposition System |
29-April-2024 17:00 |
30-April-2024 10:30 |
|
MC202300016501 |
MCF |
SITC of two numbers of 7.2m C-Band Full Coverage Antenna Terminal & RF System at MCF Bhopal |
01-August-2024 16:30 |
02-August-2024 10:00 |
|
SA202300251401 |
SAC |
UV Protection Accessories |
30-April-2024 12:00 |
30-April-2024 12:30 |
|
SA202300238901 |
SAC |
Multi-array Image Sensor |
03-May-2024 12:00 |
03-May-2024 12:30 |
|