Sl.No | Item Name | Quantity |
---|---|---|
1 | INVERTERS : Supply of solar string inverter-10 kVA rating as per the detailed specifications mentioned in part-A annexure2, sl no 6.2 | 2Sets |
2 | COMMISSIONING : Installation, commissioning and Testing of 10 kVA solar inverter with all the installation materials and Civil works etc complete | 2Sets |
3 | INVERTERS : Supply of solar string inverter- 20 kVA rating as per the detailed specifications mentioned in part-A annexure2, sl no 6.2 | 4Sets |
4 | COMMISSIONING : Installation, commissioning and Testing of 20 kVA solar inverter with all the installation materials and Civil works etc complete | 4Sets |
5 | CABLE :Supply, laying and interconnecting 4 sqmm 1.1kV grade power cable as per annexure-2 sl no.6.3 for solar power applications | 1,500m |
6 | Solar Panels :Supply and installation of 250Wp, 36 V solar PV module as per the detailed specification in part-A, annexure-2, sl no.6.1 | 10Nos. |
7 | Civil services : Supply and providing RCC pedestal as per teh details mentioned in part-A, Annexure-2, sl no.6.6 | 140Nos. |
8 | CABLE TRAY : Supply and installation of GI perforated cable tray 15mm width X 50mm height and 2.5 to 3mm thickness as per the detailed specifications in annexure-2 , slno 6.5 | 350m |
9 | PIPE : Supply and laying of suitable size CPVC pipe (minimum 20- 25 mm dia) with all the fixing hard wares etc as per detailed specifications mentioned in part-A annexure-2, sl no.6.4 | 400m |
10 | AMC for AC installations :AMC for the solar power plant as per detailed specifications mentioned in part-A, Annexure-1 and 2 for first year. | 1Yearly |
11 | AMC for AC installations :AMC for the solar power plant as per detailed specifications mentioned in part-A, Annexure-1 and 2 for second year. | 1Yearly |
12 | AMC for AC installations :AMC for the solar power plant as per detailed specifications mentioned in part-A, Annexure-1 and 2 for third year. | 1Yearly |
13 | AMC for AC installations :AM C for the solar power plant as per detailed specifications mentioned in part-A, Annexure-1 and 2 for fourth year. | 1Yearly |
14 | AMC for AC installations : AMC for the solar power plant as per detailed specifications mentioned in part-A, Annexure-1 and 2 for fifth year. | 1Yearly |